ROLO MobileTek Driver Operations Training
ROLO Transport Logo

ROLO Transport

Five Below Contractor Training

Lesson 2: Store Delivery Process

How to Complete a Five Below Delivery

Purpose

This lesson explains the basic delivery process contractors must follow when delivering Five Below freight to stores.

Before Arrival

  • Review the delivery location and window
  • Confirm freight is loaded and secured
  • Make sure liftgate and pallet jack are working
  • Be prepared to communicate any delay immediately

At the Store

  1. Arrive within the scheduled delivery window
  2. Check in with store receiving or management
  3. Unload freight using the liftgate and pallet jack
  4. Deliver pallets to the store backroom
  5. Do not downstack freight unless specifically instructed
  6. Complete scanning and paperwork
  7. Pick up empty pallets

Delivery Rules

  • Do not leave freight outside
  • Do not break down pallets
  • Do not miss the delivery window without notifying dispatch
  • Do not leave without completing required scans
Important: Early or late deliveries may be rejected by the store. Communicate immediately if timing becomes an issue.

Professionalism at the Store

  • Be respectful to store staff
  • Follow store receiving instructions
  • Stay calm if there is an issue
  • Contact dispatch before making decisions outside the normal process
ROLO Standard: Deliver professionally, follow the process, and protect the store relationship.